Maintenance By The Service Engineer; Inspection And Maintenance; Safety Checks - Sirona Sinius CS Operating Instructions Manual

Treatment center
Hide thumbs Also See for Sinius CS:
Table of Contents

Advertisement

Sirona Dental Systems GmbH
Operating Instructions SINIUS / SINIUS CS
63 22 726 D3561
D3561.201.01.03.02 05.2012
6

Maintenance by the service engineer

Maintenance by the service engineer
6.1

Inspection and maintenance

Inspection and maintenance
In order to ensure the operational safety and reliability of your treatment
center and to avoid damage due to natural wear, annual inspection and
maintenance must be performed on your treatment center. This is done
by an authorized service engineer from your dental depot.
As soon as the next maintenance call is due in less than 42 days, a
wrench symbol appears in the status line of the touchscreen after switch-
on. Below this symbol, the number of days until the maintenance deadline
are counted down (e.g. 13 d = 13 days). You should now contact your
dental depot and make an appointment.
The work steps to be performed as well as the parts which must be
replaced are specified in the document "Maintenance Certificate".
An overview of the inspection and maintenance work performed is
additionally recorded by the service engineer in the "Installation Report/
Warranty Passport". This document is part of the "Maintenance Manual".
6.2

Safety checks

Safety checks
Medical equipment is designed in such a way that the first occurrence of
a fault does not create a hazard to the safety of patients, users or other
persons. I is therefore important to detect such faults before a second
fault occurs, which might then lead to safety hazards.
For that reason it is essential to perform safety tests every 2 years which
aim particularly at detecting electrical faults (e.g. isolation defects). This
is done by an authorized service engineer from your dental depot, most
practically together with the work to be performed according to
"Inspection and maintenance" [ → 217].
Safety tests must also be performed and documented during initial
startup, after extensions/upgrades (conversion) of your treatment center
and after repair work which might affect the electrical safety of the system.
Safety checks exist
WARNING
The treatment center must not be operated if it has failed to pass the
safety tests!
The safety checks includes a visual inspection as well as measurements
of the protective ground wire connections and the equivalent leakage
currents.
The inspections and measurements to be performed are specified in the
"Maintenance Manual". The measured values must be documented there
by the service engineer.
6 Maintenance by the service engineer
6.1 Inspection and maintenance
217

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinius

Table of Contents