Argon 18 E-119 TRI+ Assembly Manual page 27

Hide thumbs Also See for E-119 TRI+:
Table of Contents

Advertisement

E-119 TRI+: 10. Handlebar Installation
Cut the extension bars (4.12.3) at the
desired length to obtain a straight
post*. The bars must not exceed
285mm in length. The cut must be
made on the elbow side. The other end
of the bar is used exclusively to install
the shifter. Apply some carbon fiber
assembly gel in the clamping area.
If using a ski bend section, no more
Max. cut 40mm
than 40mm can be cut out.
Max. 285mm
26

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-119 tri

Table of Contents