Argon 18 E-119 TRI+ Assembly Manual page 24

Hide thumbs Also See for E-119 TRI+:
Table of Contents

Advertisement

E-119 TRI+: 10. Handlebar Installation
Parts needed to adjust pads stack's height
0
Total stack height (mm)
WITH SWIVEL
Required spacer
X
Sleeve nut
Screw ( at head)
WITHOUT SWIVEL
Required spacer
None
Sleeve nut
20mm
Screw ( at head)
15mm
35
Total stack height (mm)
WITH SWIVEL
Required spacer
5 + 10
Sleeve nut
30mm
Screw ( at head)
15mm
WITHOUT SWIVEL
Required spacer
5 + 10 + 20
Sleeve nut
50mm
Screw ( at head)
15mm
70
Total stack height (mm)
WITH SWIVEL
Required spacer
10 + 40
Sleeve nut
50mm
Screw ( at head)
35mm
WITHOUT SWIVEL
Required spacer
70
Sleeve nut
80mm
Screw ( at head)
25mm
Notes:
- Always place the smaller spacers underneath
- Make sure you have at least 6 full threads on each screw
- Every spacer's screws must be tighten at 5Nm
- The M6 screw (5mm allen key) that enables the swivel's adjustment must be tightened at 8Nm
- The screws linking the extensions connectors to the swivel are 12mm long (M5 at head)
5
10
X
X
5
10
5 + 10
20mm
30mm
30mm
15mm
15mm
15mm
40
45
20
5 + 20
10 + 20
30mm
30mm
50mm
25mm
25mm
15mm
40
5 + 40
10 + 40
50mm
50mm
50mm
25mm
25mm
35mm
75
80
5 + 10 + 40
20 + 40
5 + 20 + 40
50mm
80mm
80mm
35mm
15mm
15mm
5 + 70
10 + 70
5 + 10 + 70
80mm
80mm
80mm
25mm
35mm
35mm
15
20
25
X
None
5
20mm
20mm
15mm
15mm
20
5 + 20
30mm
30mm
25mm
25mm
50
55
60
5 + 10 + 20
40
50mm
50mm
15mm
25mm
5 + 10 + 40
20 + 40
50mm
80mm
35mm
15mm
85
90
95
70
5 + 70
80mm
80mm
25mm
25mm
20 +70
5 + 20 + 70
80mm
80mm
45mm
45mm
30
10
30mm
15mm
10 + 20
50mm
15mm
65
5 + 40
50mm
25mm
5 + 20 + 40
80mm
15mm
100
10 + 70
80mm
35mm
10 + 20 + 70
80mm
55mm
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-119 tri

Table of Contents