Installing The Voip Pcb - NEC UX5000 Hardware Manual

Ip communication server
Hide thumbs Also See for UX5000:
Table of Contents

Advertisement

Chapter 2 - PCB Installation and Startup
The following table shows the LED indication when transmitting or receiving data on CN1.
LED
ACT (LED1)
DUPLEX (LED4)
LINK1000 (LED3)
LINK10_100 (LED2)

Installing the VoIP PCB:

2.4.5.1
1.
2.
3.
4.
2 - 34
Auto Negotiation Mode
100Mbps
1000
M bps
half
full
ON
ON
ON
ON
OFF
ON
ON
OFF
OFF
OFF
ON
ON
Do not remove or install this daughter board with the
power on.
With the system power off, install the VOIPDB onto the CCPU.
Insert the CCPU into the CCPU slot in the Controlling KSU.
UX5000 Central Processing Unit (CCPU) PCB (Figure 2-4 - Figure 2-5)
Refer to
(page 2-13)
for more details.
Connect the VOIPDB to the 4RTU PCB or to an external switching hub using an ethernet
cable.
Refer to the UX5000 Software Manual (P/N 09193200) for required programming.
Link Up
10Mbps
1000
M bps
half
full
ON
ON
ON
OFF
ON
ON
OFF
OFF
ON
OFF
OFF
OFF
Force Mode
100Mbps
10Mbps
half
full
half
ON
ON
ON
OFF
ON
OFF
OFF
OFF
OFF
ON
ON
ON
Chapter 2
full
ON
ON
OFF
ON

Advertisement

Table of Contents
loading

Table of Contents