To install an Memory Expansion Daughter Board:
1.
Fast Ethernet CN7
Figure 2-12: MEMORY EXPANSION DAUGHTER BOARD INSTALLATION
Chapter 2
•
Do not remove or install this daughter board with the
power on.
Insert the MEMDB into the CN2 connector on the CCPU.
●
This daughter board does not have any switches which need to be set and does not
require any hardware setting.
SW6
Status LED1
BGM/EXSP
Control CN10
USB/CN5
Status LED2
Status LED3
Status LED4
Status LED5
Serial/CN6
BGM/EXSP
Control/CN8
BGM/EXSP
Control/CN9
Load/SW1
Battery
CN3
CN1
CN2
CN4
MEMDB
Chapter 2 - PCB Installation and Startup
VOIPDB
Gbit Ethernet
<VOIPDB>
2 - 29