NEC UX5000 Hardware Manual page 95

Ip communication server
Hide thumbs Also See for UX5000:
Table of Contents

Advertisement

To install an Memory Expansion Daughter Board:
1.
Fast Ethernet CN7
Figure 2-12: MEMORY EXPANSION DAUGHTER BOARD INSTALLATION
Chapter 2
Do not remove or install this daughter board with the
power on.
Insert the MEMDB into the CN2 connector on the CCPU.
This daughter board does not have any switches which need to be set and does not
require any hardware setting.
SW6
Status LED1
BGM/EXSP
Control CN10
USB/CN5
Status LED2
Status LED3
Status LED4
Status LED5
Serial/CN6
BGM/EXSP
Control/CN8
BGM/EXSP
Control/CN9
Load/SW1
Battery
CN3
CN1
CN2
CN4
MEMDB
Chapter 2 - PCB Installation and Startup
VOIPDB
Gbit Ethernet
<VOIPDB>
2 - 29

Advertisement

Table of Contents
loading

Table of Contents