Installing The Mag8 Panel - Teletek electronics MAG8 Installation And Operation Manual

Hide thumbs Also See for MAG8:
Table of Contents

Advertisement

Fire Control Panel MAG8 - Installation and Operation Manual

2. Installing the MAG8 Panel

• Choose the best location for the panel position, with an ambient temperature between
-5°C and 40°C, away from heating sources, environmental dust and potential water
ingress.
• Remove all packaging and inspect visually the panel for any damage.
• Remove the outer cover - undo the two screws at the bottom of the cover. Stow the
cover in a safe position.
• Inspect the internal PCB and make sure the internal components are firmly in place.
• Remove the PCB from the plastic box. Stow in a safe location.
• Choose which cable entry points to knock out and carefully remove the knock-outs.
• Use the template on the back side of the packaging box to drill the mounting holes on
the wall.
• Fix the plastic housing into mounting position and insert fixing screws.
• Tighten all the fixing screws.
• Route the external cables onto the back box, make off connection glands etc., DO NOT
make any connections at this stage. ENTER THE MAINs CABLE THROUGH ITs
OWN CABLE ENTRY POINT AND KEEP MAINs WIRING AWAY FROM sYsTEM AND
OTHER LOW vOLTAGE WIRING.
• Fit the EOL modules from the supplied additional parts one-by-one to every zone
terminal. ATTENTION: Observe the polarity - the red wire to "+" point and the black
wire to "-" point.
• Fit the EOL resistors from the supplied additional parts one-by-one to the sounders
terminal.
• Re-fit the PCB to the plastic box.
• Connect the mains supply and earth to the main terminal block. DO NOT switch on the
main electrical supply at this stage.
• Position the battery in an upright position.
• When you finish with power up and testing steps, and the panel is in normal operation
mode close the front cover using the screws and nuts from the spare parts kit:
7

Advertisement

Table of Contents
loading

Table of Contents