Technical Product Manual - DCT1900
Installation Instructions, General
equipment to measure the delay times of Base Station cables and external synchronization
cables-TDR
Siemens 66 block
punch down tool
2.5

Equipment Verification

Obtain a copy of the order that was placed for the system and verify the order against the shipping
forms found on the boxes containing all the DCT1900 equipment.
2.6

Miscellaneous Items

Check that the following additional items are available:
Base Station cables (see Chapter 16, Paragraph 16.2)
RJ45 plugs and crimper for Base Stations
Material for external sync cables as specified in Chapter 18, Paragraph 18.2 if PWT air
interface synchronization is required in a multi DCT1900 system environment.
IBM compatible personal computer as specified in Installer's Quick Guide (CSMW)
Epson compatible printer (optional)
#10-12 gauge wire to connect the Modular Cabinet to protective ground.
2.7

Switch Room

Verify that there is an adequate wall space to mount the equipment. Verify the locations and
availability of adequate power and earth ground.
2-2
Install-DCT1900/R8/mw