Technical Product Manual - DCT1900
Product Specifications, Cabinets
5.4
Synchronization Distribution Board, SDB -REX-BRD0006 or ROANB 101 38
The SDB is mounted to the Modular Cabinet during system installation. It is part of the Sync Kit -
see Paragraph 5.5 only required in multiple system configurations.
Length x width
Connector for external cables
5.5
Installation Set Sync Port CPU
The installation set comprises material to install the sync ports which enable PWT air interface
synchronization between DCT1900 systems. The set comprises the following material:
SDB
CPU/SDB cables
CE Label
5-2
: 2.6" x 2.2" (66 x 56mm)
: shielded modular jacks RJ12 with six terminals
: Synchronization Distribution Board to be mounted to the
modular cabinet which enables the connection of
synchronization cabling.
: Connects the CPU to the SDB.
: CE marking label to be used if the cabinet is CE marked.
Specs-DCT1900/R8/mw
© 2000-2005