Nortel DCT1900 Technical Product Manual page 193

Nortel networks technical product manual telephone dct1900
Table of Contents

Advertisement

Power from
MCCB
Base Station 8
Base Station 1
7.3
Installation
1. Insert the CLU into the card guides in the specified slot position.
2. Gently push the board into the back connector until it locks. Don't use any force.
3. Connect the CLU power cable, TSRNB 101 33.
4. Connect the CLU signal cable, NTM/TSRNB 101 29.
Install-DCT1900/R8/mw
© 2000-2005
Installation Instructions, Cell Link Unit (CLU) – REX-BRD0014 or ROFNB 157 11/2
P0
P1
SC0
SC1
EPP0, 1
SC0
SC1
EPP0, 1
Fig. 7–2 Power Distribution on the CLU
Technical Product Manual - DCT1900
CLU
Fuse
CLC 8
CLC 1
7-3

Advertisement

Table of Contents
loading

Table of Contents