Nortel DCT1900 Technical Product Manual page 237

Nortel networks technical product manual telephone dct1900
Table of Contents

Advertisement

Caution: Mounting Arms of 12" and 18" are provided. The "creative" use of longer mounting
arms is NOT ALLOWED as considerable forces could be generated due to combinations of
housing weight, length of the mounting arm, wind loading, earthquakes and/or vibration.
These forces could result in pulling out the mounting anchors from the building with destructive
results including falling hardware, including possible injury or death to people below.
6. Complete the Installation of the Base Station
After securing the weatherproof housing to the building surface (above), terminate the signal/
power cable inside the housing with the recommended Modular Plug(s), leaving a service-loop
of approximately 12". Connect the Modular Plug(s) to the DCT1900 Base Station and install it
in the housing by hanging it on the bracket already mounted inside the housing from earlier
steps.
After verification of operation, secure the hinged door of the weatherproof housing.
Locate Base Station
Mounting Bracket
where shown and
drill .156 dia.
mounting holes.
4.0"
Install-DCT1900/R8/mw
© 2000-2005
Weatherproof Housing
(rear view)
2 1/4"
5.0"
Fig. 16-13 Base Station Mounting Bracket Attachment to Housing
Technical Product Manual - DCT1900
Installation Instructions, Base Station – KRC 101 1371
6-32
Locking
hex-nut
Mounting
Bracket
(shipped with
#6
Base Station)
flatwasher
6-32 x 5/8"
pan head
screw
16-15

Advertisement

Table of Contents
loading

Table of Contents