Nortel DCT1900 Technical Product Manual page 279

Nortel networks technical product manual telephone dct1900
Table of Contents

Advertisement

Fig. 21–2 CLU/MDF Cable Connections on the CLU or SLU
Base Station Power
The following installation steps are necessary when the Base Stations are powered via the
Modular Cabinet. Refer to Chapter 19 on how to supply Base Station power to the MCCB.
1. Connect connectors PW1 on the MCCB to the Base Station power connectors on the furthest
left CLU or SLU using the CLU/MCCB Power cable (see Fig. 21–2).
2. Connect PW2 – PW7 to the power connections of the other CLU or SLUs starting at the next
CLU or SLU.
Cabling from the MDF to the Base Station
Refer to Section 4, Chapter 4, Base Station Powering for cable type information. Figure 21-3
shows the pinout of the 66 blocks that the cable set NTM/TSRNB 101 29 terminates on. NOTICE
that only 3 pairs are brought out for each base station. These are SC0, SC1 and EPP0/1.
You must hook up the first 2 pair, SC0 and SC1, for each base station. The third pair, EPP0/1, is
only used when additional power is required due to cabling distances. (Refer to Section 4,
Chapter 4, Base Station Powering).
If a fourth pair (white/brown pair) is required then it may be punched down on top of the existing
EPP0/1, pair (white/green pair).
Install-DCT1900/R8/mw
© 2000-2005
Installation Instructions, Modular Cabinet – CLU/SLU to Base Station Cabling
Base
Station
To cable TSRNB 101 33
Power
CLC8
CLC7
To cable TSRNB 101 29/2 or
CLC6
TSRNB 101 46/2
CLC5
CLC4
CLC3
To cable TSRNB 101 29/1 or
TSRNB 101 46/1
CLC2
CLC1
Technical Product Manual - DCT1900
21-3

Advertisement

Table of Contents
loading

Table of Contents