Nortel DCT1900 Technical Product Manual page 224

Nortel networks technical product manual telephone dct1900
Table of Contents

Advertisement

Technical Product Manual - DCT1900
Installation Instructions, Base Station – KRC 101 1371
LEDs (Fig. 16-1)
LED1
LED2
LED 1
OFF
GREEN
GREEN
GREEN
GREEN
GREEN
16-2
Power LED
Green
Status LED
Green/Red/Orange
LED 2
Meaning
OFF
Base Station is not operational. There is no power.
OFF
Base Station is operational. There are no active connections.
GREEN
Connection(s) is(are) made with the base station.
RED
Base Station is unlocked. Base Station is not synchronized to RE.
FLASHING
Base Station is operational but not available (self test, not
RED/GREEN
initialized, no communication with CCFP, no UTAM approval)
ORANGE
Base Station is downloading.
Table 16-1 Meaning of LED1 and LED2
:
Base Station powered
:
Base Station Status
Install-DCT1900/R8/mw
© 2000-2005

Advertisement

Table of Contents
loading

Table of Contents