Nortel DCT1900 Technical Product Manual page 172

Nortel networks technical product manual telephone dct1900
Table of Contents

Advertisement

Technical Product Manual - DCT1900
Installation Instructions, or BDVNB 101 01/3
Testing and back up
Verify that all existing portables are working.
Verify that all existing base stations are working.
Now is the time to add any connections to LTU/SLU/CLU/DTU boards or to move any boards that
you have decided to move. Which you do first depends on what you are doing and it is up to you
to decide the order of these operations.
Add or move any boards.
Add or move any cables and 66 blocks.
Label or re-label the 66 blocks.
When you are done adding or moving things, DO a system back up. Give it a new name.
Put the card retention bar on the cabinet.
Put the bottom plate back on the cabinet.
Place the front cover on the cabinet and secure it.
4-18
Install-DCT1900/R8/mw
© 2000-2005

Advertisement

Table of Contents
loading

Table of Contents