Nortel DCT1900 Technical Product Manual page 226

Nortel networks technical product manual telephone dct1900
Table of Contents

Advertisement

Technical Product Manual - DCT1900
Installation Instructions, Base Station – KRC 101 1371
The cable set, NTM/TSRNB 101 29, that connects the CLU/SLU to the MDF brings out the three
pairs mentioned above: SC0, SC1, and EPP. Refer to Fig. 21-3, 66 Block Diagram in Chapter 21
for the pin out of the 66 Block where this cable terminates.
A minimum of -21V DC is required at the Base Station for it to operate. When a Base Station is
located too far away from the Radio Exchange to be powered by the Radio Exchange, then power
can be provided by a local -48V power supply or an AC to 48V DC adaptor. The power supply or
adapter should be placed in the last Intermediate Distribution Frame before the Base Station.
Hook the output of the power supply/adapter to the EPP wires going to the Base Station; DO NOT
connect the EPP wires at the Radio Exchange. Only the two data pairs should go from the Radio
Exchange to the Base Station in this situation. The EPP wires are picked up in the last
Intermediate Distribution Frame where the Base Station's power source is located.
16.3
Base Station Cable Delay Measurement
The cable delay in each of the cable pairs going to every Base Station must be measured in order
to program the Base Station delays into the system at initialization time. This is necessary in order
to synchronize all Base Stations in the system.
Base Station cable delay may be measured by two methods, ADM or measurement with a TDR
(Time Domain Reflectometer).
ADM, or Automatic cable Delay Measurement, is a feature where the CPU automatically
measures the delay in the cable hooked up to a Base Station. Beginning with the hardware and
software releases listed below, the DCT1900 system can automatically determine the correct Base
Station cable delay. This means that it is no longer mandatory to have a TDR (Time Domain
Reflectometer) on each and every job site to measure the cable delays.
Item
Hardware PN
CPU1
REX-BRD0004
CPU2
REX-BRD9033
CPU2
REX-BRD9034
SLU
REX-BRD0015
CLU-S
REX-BRD0016
CSM
NTM 201 2087
CSM
NTM 201 1813
CSMW
REX-MCT9023
CSMW
REX-MCT9022
Table 16-2 Minimum Release Requirements to Support ADM
Note:
ADM will not be supported if the system is not comprized of the listed minimum release levels. The
Automatic delay measurement does not work with the CLU boards (REX-BRD0014 or ROFNB 157
11 or ROFNB 157 11/2)
16-4
Rev
Firmware/Software
R1A
DCT1900 Firmware
DCT1900 Firmware
R1A
DCT1900 Firmware
R1A
DCT1900 Firmware
R3B
CLU-S Board Controller
R3A
CLU-S Board Controller
R2B
Unlicensed
R2B
Unlicensed
R3C
UTAM
R3C
International
Application
Firmware PN
Mobility
RYS 105 447
Standalone
RYS 105 657
Standalone
Mobility
MOB & SA
RYSNB 101 19
MOB & SA
RYSNB 101 19
Standalone
LZY 213 1031
Mobility
LZY 213 903
MOB & SA
MOB & SA
Rev
R2A
R2A
R2A
R2A
R2B
R2A
Install-DCT1900/R8/mw
© 2000-2005

Advertisement

Table of Contents
loading

Table of Contents