Panel Mounting (Plastic Box); Installation Kit; Removing The Enclosure Lid; Installing The Enclosure Lid - Honeywell Galaxy 2 Series Installation Manual

Hide thumbs Also See for Galaxy 2 Series:
Table of Contents

Advertisement

Panel Mounting

Panel Mounting (Plastic Box)

Installation Kit

The Galaxy 2 Series plastic box comes with an installation kit. It contains 13 zone links, a cable clamp with
two self tapping screws, two M4 x 20mm lid screws, a tamper spring, battery connector leads and 24, 1K
resistors.
WARNING:
The lid of the plastic box must not be removed before isolating the mains supply.
Illumination of the keypad power LED indicates the presence of a.c. mains supply.

Removing the Enclosure Lid

1. Remove the two M4 x 20 mm pan head screws from the bottom corner of the lid.
2. Pull the lid away from the lid hinge recesses (two menus of four) on the top of the enclosure base .
3. Remove the lid.

Installing the Enclosure Lid

1. Hold the lid at an angle of 90 deg. to the enclosure base.
2. Place the eight (two menus of four) lid hinges into the recesses on the top of the enclosure base.
3. Swing the lid down making sure that the hinges fit into the holes in the top of the enclosure rim.
4. Attach the lid in place with the two M4 x 20 mm pan head screws provided.

Removing and Replacing the Galaxy 2 Series PCB

NOTE: The plastic box comes with the PCB installed. The PCB must be removed to enable access to the
keyhole mounting slot (see Figure 16).
Lid Hinge
Recess
Mains Terminal Block
with 200mA fuse
Secure Mains
Cable After Feeding
Through Entry Point
Transformer Output
Lead to PCB
Terminal Marked
Lid Screw
Galaxy 2 Series Installation Manual
Keyhole
Mounting
Slot
PCB Clip
Mounting
Hole
Figure 16. Galaxy 2 Series Plastic Box Layout
PCB
Keyhole
Mounting
Slot
PCB Clip
User Instruction
retaining Clip
20
Lid Hinge
Recess
Cable Entry
Points
Mounting
Hole
Lid Screw

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents