Installation - Suzuki RM-z450 Owner's Service Manual

Hide thumbs Also See for RM-z450:
Table of Contents

Advertisement

INSTALLATION

Install the kick starter in the reverse order of removal. Pay atten-
tion to the following points:
• Install the kick starter guide 1.
# Kick starter guide bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
• Install the kick starter drive gear 2, washer 3 and snap ring
4 onto the kick starter shaft.
Replace the snap ring 4 with a new one.
" 09900-06107: Snap ring pliers
• Install the spring guide 5 onto the kick starter shaft.
NOTE:
Align the concave of spring guide A with kick starter shaft hole B.
• Install the return spring 6 into the kick starter shaft hole.
• Install the kick starter 7 onto the kick starter shaft.
NOTE:
Be sure to align the punch marks on the kick starter and kick
starter shaft when fitting the kick starter.
CAUTION
KICK STARTER
8-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents