Buell 2002 P3 Service Manual page 277

Table of Contents

Advertisement

HOME
INSTALLATION
1.
Install starter and starter gasket from the right side.
2.
See
Figure 5-28.
Connect wiring to starter.
a.
Connect solenoid wire (3).
b.
Attach positive battery cable ring terminal (2).
c.
Install nut with washer (1) (metric). Tighten to 80-
100 in-lbs (9-11 Nm).
d.
Replace protective boot.
3.
See
Figure 5-29.
Install both starter mounting bolts and
washers. Tighten to 13-20 ft-lbs (18-27 Nm).
4.
Position oil hoses in clamp and install clamp to through
bolt with new locknut. Make sure hoses are not kinked or
restricted.
5.
Install primary cover. See
6.
Fill transmission to proper level with fresh lubricant. See
1.10 TRANSMISSION/PRIMARY
7.
Install left side footrest support assembly. See
FOOTPEGS AND FOOTPEG SUPPORT
8.
Install air cleaner. See
4.3 AIR
1
1
WARNING
WARNING
Always connect positive battery cable first. If the positive
cable should contact ground with the negative cable
installed, the resulting sparks could cause a battery
explosion which could result in death or serious injury.
9.
Connect battery cables, positive cable first. TIghten ter-
minal hardware to 60-96 in-lbs (7-11 Nm).
10. Install seat. See
2.28
SEAT.
5-18
2002 Buell P3: Electric Starter
6.2 PRIMARY
CHAIN.
FLUID.
2.21
BRACKETS.
CLEANER.
7768
Positive
Battery Ring
Terminal
Connector [128]
Figure 5-28. Starter Wires
7766
Starter Mounting
Bolts and Washers
13-20 ft-lbs
(17.6-27.1 Nm)
Figure 5-29. Starter Mounting (Primary Side)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Buell blast p3 2001

Table of Contents