Loading Material - µ-Dimension BST 1200es User Manual

Hide thumbs Also See for BST 1200es:
Table of Contents

Advertisement

Starting a build from the display panel:
If Wait for Part has not been activated, you can send the part to the printer and start the part from
the display panel after the part has been sent to the printer.
1.
From your CatalystEX workstation, send a part to the printer. The display will show Idle/Ready
to Build and the name of the first file that is in the queue waiting to be built.
2.
Insert a modeling base.
CAUTION:
calibration errors, poor part quality, and loss of extrusion may occur.
Additional modeling bases are available from your reseller.
3.
From the display panel press Start Model to start building the part.

Loading Material

Material cartridges are factory packaged in a box and an anti-static, moisture-proof bag to
preserve shelf life. Material will stay humidity free inside the cartridge for at least 30 days after
opening. Shelf life is more than one year if the cartridge package remains sealed.
Load material cartridges:
1.
Remove packaging.
2.
If present, remove the red sealing plug from the cartridge: (see
Note:
a.
Turn the plug a quarter turn counter clockwise.
b.
Lift up the plug to remove it from the cartridge - discard (or recycle) the plug.
Figure 18:
Remove red plug before loading
DO NOT reuse modeling bases. If a modeling base is reused,
Plug must be removed before cartridge can be installed.
27
Figure
18.)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sst 1200es

Table of Contents