32 Co MMiSSionin G And t e Stin G
A. e lectrical installation
1. Checks to ensure electrical safety should be carried out by a
competent person.
2. ALWAYS carry out the preliminary electrical system checks,
i.e. earth continuity, polarity, resistance to earth and short
circuit, using a suitable test meter.
3. After wiring the boiler, all grommets in the bottom panel
MUST be in place to ensure that boiler case sealing is
maintained.
Whilst effecting the required gas tightness test and purging air from the gas installation,
Warning .
open all windows and doors, extinguish naked lights and do no T smoke.
Gene RAl
Please n ote: The combustion for this appliance has
been checked, adjusted and preset at the factory for
operation on the gas type defined on the appliance
data plate. d o not adjust the air/gas ratio valve.
Having checked:
-
That the boiler has been installed in accordance
with these instructions.
-
The integrity of the flue system and the flue seals,
as described in the Flue Installation section.
Proceed to put the boiler into operation as follows:
CHECK THE OPERATIONAL (WORKING) GAS
inlet
PRe SSURe
CH Flow
Set up the boiler to operate at maximum rate by
referring to Frame 38, Service Mode Maximum Rate.
this mode will operate the boiler at
maximum heat output to ensure
the boiler is operating at maximum
this must be carred out when the
system is cool.
With the boiler operating in the
maximum rate condition check
Black
that the operational (working)
Handle
gas pressure at the inlet gas
pressure test point complies with
the requirements - refer to "Gas
Supply" on page 10.
Ensure that this inlet pressure
can be obtained with all other
gas appliances in the property
working.
As part of the commissioning process, the combustion of this appliance must be checked
and the Benchmark Checklist completed. A flow chart to assist is provided on page 73.
it iS A Condition
ben CHMARK Co MMiSSionin G CHe CKli St iS f Ully Co MPleted
vogue system boiler -
inStAllAtion
DHW Outlet
Gas Supply
Yellow
Handle
Gas Pressure
Test Point
of t He MAn Uf ACt URe RS WARRAnty t HAt t He
And left
Installation and Servicing
b . Gas installation
1. The whole of the gas installation, including the meter,
should be inspected and tested for tightness and purged in
accordance with the recommendations of BS. 6891.
In IE refer to IS.813:2002.
2. Purge air from the gas installation by the approved methods
only.
DHW Inlet
CH Return
Blue
Handle
3G9927
Attention
!
Wit H t He APPli An Ce
Safety
Drain
Valve
Black
Handle
35

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Vogue system s18Vogue system s26Vogue system s32