Download Print this page

IDEAL VOGUE SYSTEM S15 Installation And Servicing page 52

Hide thumbs Also See for VOGUE SYSTEM S15:

Advertisement

58 iGnition e le Ct Rode Re Pl ACe Ment
1. Refer to Frames 45 & 46.
2. Refer to Frame 53.
3. Disconnect the ignition lead and the earth
connection
4. Release the 2 securing screws and carefully
withdraw the probe.
5. Check the gap on the replacement ignition
electrode is 4.5 ± 0.5mm.
6. Ensure the sealing gasket is fitted and in good
condition
7. Carefully feed the electrode into the burner/
door assembly and secure with the 2 screws
ensuring correct orientation.
8. Reconnect the lead and earth.
9. Check the operation of the boiler. Refer to
Frames 32-35.
59 f l AMe d ete Ction e le Ct Rode Re Pl ACe Ment
1. Refer to Frames 45 & 46.
2. Refer to Frame 53.
3. Disconnect the detection lead.
4. Release the 2 securing screws and withdraw
the probe.
5. Ensure the sealing gasket is fitted to the
replacement electrode and in good condition
6. Carefully feed the electrode into the burner/
door assembly and secure with the 2 screws
ensuring correct orientation.
7. Reconnect the lead
8. Check the operation of the boiler. Refer to
Frames 32-35.
52
52
Se RViCin G
SeRViCinG
5
4.5±0.5
6
vogue system boiler -
7
4,6
Installation and Servicing
4,7

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Vogue system s18Vogue system s26Vogue system s32