Download Print this page

IDEAL VOGUE SYSTEM S15 Installation And Servicing page 45

Hide thumbs Also See for VOGUE SYSTEM S15:

Advertisement

44 Se RViCin G SCHed Ule
f or the very latest copy of literature for specification & maintenance practices, visit our website www.idealboilers.com, where you
will be able to download the relevant information. N.B. Technical Bulletins are also available on www.idealboilers.com.
Warning. Always turn off the gas supply at the gas service cock, and switch OFF and disconnect the electricity
supply to the appliance before servicing.
Combustion testing must be carried out by a competent person using a combustion analyser conforming to BS7927.
To ensure the continued safe and efficient operation of the appliance it is recommended that it is checked at regular intervals and
serviced as necessary. The frequency of servicing will depend upon the installation condition and usage but should be carried out
at least annually.
It is the law that any service work must be carried out by a Gas Safe Registered Engineer. In IE service work must be carried out
by a Registered Gas Installer (RGII).
in SPe Ction
1. Light the boiler and carry out a pre-service check, noting any
operational faults.
2. Check the flue terminal (and terminal guard if fitted) is undamaged
and clear of any obstruction.
3. Check all water and gas joints for signs of leakage. Remake any
suspect joints ensuring a gas tightness check is carried out if
applicable and the water system is correctly refilled, vented and
re-pressurised.
Cle Anin G PRo Ced URe
n ote. In order to carry out either servicing or replacement of
components the boiler front panel must be removed. Refer to
Frame 50.
1. Clean the main burner. Refer to Frame 47.
2. Clean the heat exchanger & condensate trap/siphon. Refer to
Frames 50 & 51.
3. Check the main injector for blockage or damage. Refer to Frame
48.
4. Check that the flue terminal is unobstructed and that the flue
system is sealed correctly.
The cleaning procedures are covered more fully in Frames 45-52 and
MUST be carried out in sequence.
iMPo Rt Ant.
5. After completing the servicing or exchange of components always
test for gas tightness.
6. When work is complete the front panel MUST be correctly refitted,
ensuring that a good seal is made.
d o no T o Pera Te the boiler if the front panel is not
fitted.
7. If, for any reason, the condensate trap/siphon has been removed
ensure the trap is refilled with water before
reassembling.
8. Check the gas consumption.
9. Check combustion by connecting the flue gas analyser to the flue
gas sampling point as shown in the diagram and measure CO &
CO
.
2
If the CO/CO
ratio is greater than 0.004 AND the integrity of the
2
complete flue system and combustion circuit seals have been
verified and the inlet gas pressure (and gas rate) have been
verified, then contact Ideal.
10. Complete the service section in the Benchmark Commissioning
Checklist.
vogue system boiler -
SeRViCinG
Installation and Servicing
Gene RAl
Please n ote: During routine servicing, and after any
maintenance or change of part of the combustion
circuit, the following must be checked:
-
The integrity of the flue system and the flue seals,
-
The integrity of the boiler combustion circuit and
the relevant seals
-
The operational (working) gas inlet pressure at
maximum rate.
-
The gas rate
-
The combustion performance.
Co MPeten Ce to CARRy o Ut t He CHe CK
of Co Mb UStion Pe Rfo RMAn Ce
BS 6798:2009 Specification for
Please n ote:
installation and maintenance of gas-fired boilers of
rated input not exceeding 70kW net advises that:
-
The person carrying out a combustion
measurement should have been assessed as
competent in the use of a flue gas analyser and
the interpretation of the results.
-
The flue gas analyser used should be one
meeting the requirements of BS7927 or BS-
EN50379-3 and be calibrated in accordance with
the analyser manufacturers requirements, and
-
Competence can be demonstrated by satisfactory
completion of the CPA1 ACS assessment, which
covers the use of electronic portable combustion
gas analysers in accordance with BS7967, Parts
1 to 4.
Flue
Sampling Point
(ensure cap is
secured after
sampling)
45

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Vogue system s18Vogue system s26Vogue system s32