Download Print this page

IDEAL VOGUE SYSTEM S15 Installation And Servicing page 31

Hide thumbs Also See for VOGUE SYSTEM S15:

Advertisement

28 Sy Ste M Cont Rol Wi Rin G
S Pl An , inte Rn Al ti Me R
Fused
Spur
N
L
br
SWITCH
SWITCH
FROST
LIVE CH
LIVE HW
STAT
vogue system boiler -
inStAllAtion
S Plan
Valve
S Plan
Valve
g
R/S
CH
R/S
L
N
On
On
br
b
L
N
Boiler
Installation and Servicing
b
g/y
br
o
C/S
br
Blr
Blr
HW
HW
C/S
On
On
On
Off
On
CH
HW
br
br
br
Note that a hydraulic
bypass is required to
allow pump overrun
g
HW
b
g/y
S Plan
Valve
CH
S Plan
Valve
o
Note: only 1 switched live need be
taken back to the boiler (Switch Live
CH) if an Outside Sensor is not fitted
and there is no requirement for separate
flow temperature set points for CH and
DHW.
Note that a hydraulic bypass is required
to allow pump overrun
31

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Vogue system s18Vogue system s26Vogue system s32