23 Conne Ction S & f illin G
note S.
Ensure all boss blanking plugs are removed before connecting hardware. Each
valve must be fitted to the correct boss as shown in the picture.
Ensure each union is fitted with fibre seals provided.
Do not subject any of the isolating valves to heat as the seals may be damaged.
WAte R Conne Ction S CH
1. Connect the CH flow service valve and copper tail
provided in the hardware pack to the threaded boss
connection provided at the lower rear of the boiler.
2. Connect the CH rtn. valve (black handle) and copper tail.
3. If connecting the boiler to heating loads in excess of
17.6kW (60,000 Btu/h), connecting flow and return heating
systems pipework must be sized in 28mm diameter at the
point of pipe connection to the boiler tails. use 22mm x
28mm pipe adaptors as appropriate.
GAS Conne Ction
iMPo Rt Ant .
The gas service cock is sealed with a non-metallic
blue fibre washer, which must not be overheated when making
capillary connections. Refer to Frame 1 for details of the position
of the gas connection.
For additional gas supply info refer to "Gas Supply" on page 10.
PRe SSURe Relief
VAl Ve dRA in
The pressure relief valve connection, located at the bottom right-
hand side of the boiler, comprises a 15mm diameter stub pipe.
The Installer to provide a compression joint on the end of the
stub pipe. This assists with pipe removal when servicing.
The discharge pipe should be positioned so that the discharge
of water or steam cannot create a hazard to the occupants of
the premises or damage the electrical components and wiring.
A purpose made pressure relief valve drain
pipe is provided with the boiler to allow safe
discharge through a wall to the outside of
the building. This is particularly relevant to
'high rise' installations but can be used for all
installations.
Pressure relief valve
Drain Connection
15mm elbow
or fittings
(not supplied)
28
inStAllAtion
CH Flow
Black
Handle
Pressure relief valve
Drain Pipe
fillin
G
iMPo Rt Ant - when filling:
When filling, there may be a slight water leak from the air vent
therefore electrical connections should be protected.
fillin
G
iMPo Rt Ant - when filling:
A. Ensure the dust cap on air vent located at the rear of the
pump chamber is slightly unscrewed.
b . When filling, there may be a slight water leak from the air
vent therefore electrical connections should be protected.
1. Ensure that the CH isolating handles are open.
2. Fill and vent the system. Refer to Frame 2 for filling and
setting pressure procedure.
3. Check for water soundness.
Gas
Supply
Yellow
Handle
Note that all isolation
handles are shown in
the open postion.
vogue system boiler -
CH
Return
Black
Handle
Installation and Servicing