6.1.4
Switch on / off seal function
For large deliveries:
• Pull the bar as far as it goes, and fold
down the letter guide.
(ultimail with feeder / sealer only)
Sealing
If the letters are to be sealed:
• Place the "seal envelope" switch to the
rear into seal position.
• Check filling level in water tank.
• If necessary, top up the water. Read
Chapter 14.5 on page 118.
Only use envelopes that are suited for
mechanical sealing. For details to
envelope specifications, read page 176.
Non seal
If the letters are not to be sealed or if they
are sealed already:
• Place the "seal envelope" switch to the
front into non seal position.
Metering
39
Need help?
Do you have a question about the ultimail and is the answer not in the manual?