Getting Started; Overview Of Start-Up Procedure; Table 2-4 Startup Overview; Figure 2-2 Cpci-6115 Thermally Significant Components (Secondary Side) - Motorola CPCI-6115 Installation And Use Manual

Compactpci single board computer
Table of Contents

Advertisement

Getting Started

Figure 2-2
2.4
Getting Started
This section provides an overview of the steps necessary to install and power up the CPCI-
6115, any additional equipment requirements, and a brief section on unpacking and ESD
precautions. As identified in the following table, several steps can be omitted if your board has
been shipped with PMCs already installed.
2.4.1

Overview of Start-up Procedure

The following table lists the things you will need to do before you can use this board and tells
where to find the information you need to perform each step. Be sure to read this entire chapter,
including all Caution and Warning notes, before you begin.

Table 2-4 Startup Overview

Task
Unpack the hardware
Configure the hardware by setting jumpers
on the baseboard and transition module.
CPCI-6115 CompactPCI Single Board Computer Installation and Use (6806800A68D)
CPCI-6115 Thermally Significant Components (Secondary Side)
U101
U89
U102
U96
Hardware Preparation and Installation
Section or Manual Reference
Unpacking and Inspecting the Board
Setting Switches and Jumpers
Jumper Settings
(CPCI-6115-MCPTM)
Page
37
(CPCI-6115)
37
126
35

Advertisement

Table of Contents
loading

Table of Contents