Continue with the setting as follows:
be sure that piston n° 1 is the MSP in burst phase; in
this position "T" notch on the phonic wheel is in line
with the reference notch on the bedplate.
Remove the copper thread from distribution chain,
keep the chain tightened.
Engine timing is required whenever the
intermediate gear or the crankshaft are
replaced. Refer to the procedure on page 36,
Section D.
Cylinder kit
- 13 -
C