Installation - Mercury 45 Jet 50-55 Service Manual

Table of Contents

Advertisement

5. Place springs and brushes into brush holder and hold
in place with brush retainer tool.
6. Lubricate bushing with one drop of SAE 10W oil. DO
NOT over-lubricate.
a
a - Brush Retainer Tool
b - Bushing
7. Position armature into starter frame so that commuta-
tor end of armature is at end of starter frame where per-
manent magnets are recessed 1" (25.4mm). Align
marks (a) as shown.
8. Install commutator end cap onto starter frame; align
marks (b) as shown, and remove brush retainer tool.
9. Install thru bolts (c) and torque to 70 lbs. in. (8 N·m).
c
a
b
2B-20 - ELECTRICAL and IGNITION
b
11661
c
11648

Installation

1. Install 2 rubber collars and 2 rubber bumpers.
a
b
a - Rubber Collars
b - Rubber Bumpers
2. Install components as shown.
3. Connect battery leads to battery.
c
b
a
e
a - Starter
b - Clamp
c - Bolts (2)
d - Black Cable (from Battery)
e - Black Cable (from Solenoid)
a
11645
c
d
51209
90-817643R1 DECEMBER 1996

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Marathon-seapro 60-60Marathon-seapro 60 bigfoot

Table of Contents