• Apply grease to the hatched area A before installing the
throttle grip 1.
' 99000-25010: SUZUKI SUPER GREASE "A"
• Insert the projection A of the right handlebar switch into the
hole of the handlebar.
• Apply grease to the throttle cables and cable pulley.
' 99000-25010: SUZUKI SUPER GREASE "A"
• Install the front brake master cylinder. ("8-45)
• Apply handle grip bond to the left handlebar end B before
installing the left handlebar grip rubber.
• Insert the projection C of the left handlebar switch box into
the hole of the handlebars.
• Install the rear brake master cylinder. ("8-50)
After installing the handlebars, the following adjustments are
required before riding.
• Wiring harness, cable and hose routing.
("10-15, -17 and -19)
• Throttle cable play ("2-11)
A: 135 mm
or equivalent
or equivalent
CHASSIS
8-21