Suzuki Burgman UH125 Service Manual page 201

Table of Contents

Advertisement

7-6
COOLING AND LUBRICATION SYSTEM
RADIATOR
• Connect the cooling fan thermo-switch coupler 1 and the
cooling fan lead wire coupler 2.
• Clamp the cooling fan thermo-switch lead wire and cooling
fan lead wire with the frame.
• With the hooked part A connected to the radiator end, install
the radiator.
• Connect the radiator hose 3.
• Connect the radiator hoses 4, 5.
• Tighten the radiator mounting bolt securely.
• After the radiator has been installed, fill engine coolant and
perform air bleeding. ($2-13)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uh125125Uh125 2008Uh125 2007Uh125 2009

Table of Contents