Post Mount; Arm And Gate Bracket Installation - DoorKing 6050-080 Installation And Owner's Manual

Vehicular swing gate operator
Table of Contents

Advertisement

1.5 Post Mount

Mount the post base into the concrete
before installing the operator.
The post mount installation will allow
the operator to be mounted low enough
to attach the gate bracket to the lower
gate rail if desired.
Operator MUST
be level.
Low
High
Volt
Volt

1.6 Arm and Gate Bracket Installation

30" Crank Arm
Point arms towards
gate bracket.
Crank Power Arm
Adjust the locknut on the crank power
arm so that it is snug against the
washer, but will still allow the crank arm
to rotate with little force. This is the
operator's manual release option when
the crank arm is unlocked.
6050-065-C-2-16
Note: 2" thick
gate Illustrated.
90°
Gate Bracket Height
5"
Arm
Rotation Area
This distance can vary (6" minimum).
Depth of the concrete pad is
determined by soil conditions and
local building codes. Reinforced
concrete recommended.
Assemble arms as shown with the gate in the closed
position. The elbow assembly's flange MUST be on the
opposite side of the gate in the closed position. This is
the physical stop used to set the open and close limits.
Flange
Do not secure the elbow assembly
to the arms until the arms have
been adjusted. (See next page).
Open Gate
26"
43"
Elbow
Assembly
60" Connecting Arm
34"
Concrete
6"
Position
Concrete
Post Base
Conduit
2"
18.5"
Run all conduit on the opposite
side of the open gate.
Closed Gate
Arms MUST be level.
Install gate
5"
bracket to gate.
Do not insert the locking pin or padlock
into the crank arm. It will be installed
after arms have been adjusted.
12"
10"
Gate Rail
Varies
11