Post Mount Or Pad Mount Base Assembly - DoorKing 6050-080 Installation And Owner's Manual

Vehicular swing gate operator
Table of Contents

Advertisement

1.2 Post Mount or Pad Mount Base Assembly

(2) 1 1/2" bolts through the main
Post Support Base
Screw the posts to the support
plate and mount into concrete
BEFORE attaching the operator.
Pad Support Base
Remove the cover from the
operator and GENTLY place
the operator on its side before
attaching the pad base.
Hardware for Pad Mount:
(6) 1 inch bolts, lockwashers and nuts for support legs.
(2) 1 inch bolts and nuts for support plate.
(2) 1 1/2 inch bolts and nuts. For support plate.
(3) Non-slip nuts. For existing threaded studs on bottom of operator.
6050-065-C-2-16
gear bracket mounting holes.
(2) 1 1/2" bolts through the main
(2) 1" bolts through the main gear bracket mounting holes.
Hardware for Post Mount:
gear bracket mounting holes.
(2) 1 1/2 inch bolts. For support plate.
(2) 1 inch bolts. For support plate.
(3) Non-slip nuts. For existing threaded
studs on bottom of operator.
(2) 1" bolts through the main
gear bracket mounting holes.
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6050-0816100-0806100-081

Table of Contents