EAS24100
CYLINDER HEAD
Removing the cylinder head
10 Nm (1.0 m
kg, 7.2 ft
•
46 Nm (4.6 m
E
35 Nm (3.5 m
kg, 25 ft
•
Order
Camshafts
Exhaust assembly
Thermostat/Coolant temperature sensor
Coolant pipe
Intake and exhaust camshafts
1
Cylinder head
2
Cylinder head gasket
3
Dowel pin
Ib)
•
kg, 33 ft
Ib)
•
•
New
Ib)
•
Job/Parts to remove
3
1
Q'ty
Refer to "CAMSHAFTS" on page 5-6.
Refer to "ENGINE REMOVAL" on page 5-1.
Refer to "THERMOSTAT" on page 6-7.
Refer to "OIL COOLER" on page 6-4.
Refer to "CAMSHAFTS" on page 5-6.
1
1
2
For installation, reverse the removal proce-
dure.
5-15
CYLINDER HEAD
2
New
Remarks