Installation Site Preparations; Tool List; Installation Preparation - Provision ISR Z-22IR User Manual

Intelligent ir ptz camera
Table of Contents

Advertisement

RTC
IR Light switch
Work
Temperature
Work Humidity

3 Installation Site Preparations:

3.1 Tool List:

(1) Screws*
(3) Philips screwdriver
(5) Wire stripper
(7) Electric drill
(9) BNC connector
*Included in the kit

3.2 Installation Preparation:

(1) Check the space and toughness of the site and make sure that the
environmental conditions meet the installation requirements for this product.
(2) The installation surface should be able to bear 4 times the weight of the
PTZ and its accessories.
Set any functions at any time
Superpower LED:Default: Zoom x1~5: open the
near-distance IR lights; Zoom x6~9: open the
near-distance and middle-distance IR lights;
Zoom >x10: turn off the near-distance IR lights,
open the middle-distance and far-distance IR
lights.
Indoor:0℃~+50℃;
Outdoor :-20℃~+50℃ (with heater)
<90%
(2) Monkey wrench
(4) Straight Screwdriver
(6) Socket head wrench
(8) Hammer
(10) BNC Clamp
6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Z-22IR and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Z-27ir

Table of Contents