Toyota Quilt 50 Instruction Manual page 17

Hide thumbs Also See for Quilt 50:
Table of Contents

Advertisement

Quilt50_ES.book Page 10 Monday, January 23, 2006 2:16 PM
C-1
C-2
English
3. Pull the thread to the left, and bring it under the
tension spring then to delivery eye 2. (fig C-1)
❈ Make sure the thread runs clockwise when
pulling the thread as shown in (fig C-2).
4. Raise the needle to its highest position, and raise
the presser foot lever.
Open shuttle cover.
5. Unwind about 10 cm of thread from the bobbin
case.
6. Hold the bobbin case by the latch, push it into the
shuttle race. Release the latch when the bobbin is
fully inserted. (fig D)
Bobbin case stopper should always face
7.
upwards and fit into shuttle race way slot. (fig E)
D
E
English: Slot
Espanol: Ranura
3. Tire el hilo hacia la izquierda y hágalo pasar por
debajo del resorte de la tensión, y de ahí pasar por
(f ig. C-1).
la ranura 2
❈ Asegúrese que el hilo gire en el sentido de las
manecillas del reloj, cuando Ud. Tire el hilo,
como se muestra en (fig. C-2).
4. Lleve la aguja a la posición más alta, y suba la
palanca alza prensatelas.
Abra la cubierta de la bobina.
5. Desenrolle unos 10 cms. De hilo de la bobina.
6. Tome la bobina desde la aldaba, empújela dentro
de la caja carril. Suelte la aldaba cuando la bobina
esté completamente insertada (fig. D).
7. El dedo posicionador de la bobina siempre debe
estar hacia arriba, y encaja dentro de la ranura del
Cangrejo (fig. E).
English: Stopper
Espanol: Dedo posicionador
de la bobina
English: Bobbin Case
Espanol: Bobina
Español
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents