Installing The Switch On A Workbench - H3C S12500 Installation Instructions Manual

Routing switches
Hide thumbs Also See for S12500:
Table of Contents

Advertisement

Installing the Switch on a Workbench

You can also install the switch on a clean and stable workbench or the ground.
Installation Preparation
The workbench or ground is sturdy enough to support the switch.
The workbench or ground for installing the switch is reliably grounded.
Installation Procedures
Allow 0.8 m (2.62 ft.) of clearance around the device for heat dissipation.
Step1 Carry the switch at both sides with another person to the place in front of the workbench slowly.
Step2 Lift the device a little higher than the workbench and put it on the workbench.
Step3 Fix the device with L-type brackets to avoid incline and sliding of the device.
Figure 3-4 Install L-type brackets
(1) Cabling rack
Step4 Install the cabling racks at both sides of the device and fasten them with screws.
(2) L-type bracket
3-4
(3) Mounting screw

Advertisement

Table of Contents
loading

Table of Contents