Installation Procedures - H3C S12500 Installation Instructions Manual

Routing switches
Hide thumbs Also See for S12500:
Table of Contents

Advertisement

Keep the removed the blank panel and protective metal box properly for future use.
All the boards for the S12500 are hot-swappable.

Installation Procedures

Step1 Remove the protective metal box before installing an MPU:
Wear an ESD-preventive wrist strap and then loosen the captive screws that fix the MPU to the
protective box with a Philips screwdriver.
Pull the MPU out of the protective box gently.
Step2 Move the ejector levers of the MPU outwards, hold the MPU by the handle, and push the MPU into the
slot along slide rails slowly.
Step3 Push the ejector levers inward to ensure a firm contact between the MPU and the backplane.
Figure 3-15 Install an MPU
Step4 Position the screws into the holes and fasten them with a screwdriver to fix the MPU.
3-13

Advertisement

Table of Contents
loading

Table of Contents