Examining the installation site

The switch can only be used indoors. To make sure the switch operates correctly and prolong its service
lifetime, the installation site must meet the requirements for load-bearing, temperature, humidity,
cleanness, EMI, grounding power module, ventilation, and space. For more information, see H3C
S10500 Switch Series Installation Guide.

Installing the switch

Attaching the slide rails to the rack

1.
Read the signs on the slide rails to identify the left and right slide rails and their front ends, as
shown in
Table 3 Description for signs on the slide rails
Sign
F/L
F/R
2.
Mark the installation position on the rack for the slide rails:
a.
Make sure the top flange of a slide rail aligns with the middle of the narrower metal area
between holes in a rack post, as shown in
b.
Each rack post requires six screws to attach the slide rail. Mark only the uppermost and
lowermost holes.
c.
Mark the square holes at the same height on the other three rack posts.
Figure 4 Determining the cage nut installation holes by using a slide rail
(1) Middle of the narrower metal area between holes
3.
Install six cage nuts in the square holes in each rack post, as shown in
Table
3.
Meaning
Front end of the left slide rail
Front end of the right slide rail
Remarks
Mount this end to the front left rack post.
Mount this end to the front right rack post.
Figure
4.
4
Figure
5.

Advertisement

Table of Contents
loading

This manual is also suitable for:

S10504S10508S10500 seriesS10508-vS10510S10512

Table of Contents