Baxi Solo 3 PFL 30 Installation & Servicing Instructions Manual page 41

Wall mounted powered flue gas fired central heating units
Table of Contents

Advertisement

60, 70 and 80
Models Only
Fig. 125
Pilot Hood
Pilot Injector
Sealing Washer
Fig. 127
© Baxi Heating UK Ltd 2009
Fig. 124
Fig. 126
10.0
Changing Components
10.10
Burner (Fig. 124)
1. Remove the burner assembly by pulling it forward.
2. Fit new burner and re-assemble all components in
reverse order of dismantling.
10.11
Burner Injector (Fig. 125)
1. Release and remove the burner injector which is
screwed into the burner feed manifold.
2. Fit the new burner injector ensuring that the copper
washer is in position. Tighten the injector fully.
3. Re-assemble all components in reverse order.
10.12
Pilot Burner Injector (Fig. 126)
1. Remove the right hand side insulation carrier bracket
by releasing the screw. Remove the side insulation panel.
2. Release the screw securing the pilot hood and
remove. Carefully remove the pilot injector. Fit the new
pilot injector ensuring the new sealing washer is in
position. Tighten the injector fully.
3. Re-assemble all components in reverse order.
10.13
Gas Manifold (Fig. 127)
1. Remove the right hand side insulation carrier bracket
by releasing the screw. Remove the side insulation panel
(Fig. 124).
2. Remove the two screws securing the manifold from
the inside of the combustion box and slide the manifold
forward from under the two rear locating studs.
3. Remove valve and ancillary components from
manifolds as necessary.
4. Replace all ancillary components onto manifold and
replace manifold by sliding rear edge backwards under
the two rear locating studs and securing from inside the
combustion box using the two screws previously
removed. Ensure that the sealing gasket is properly
positioned and undamaged.
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents