5.0 Installation
5.3
Position the Boiler
1. Choose a suitable position for the boiler making
necessary allowances for the minimum clearances
required (see page 10).
2. Hold the wall template against the wall at the
required boiler location. Ensure that the top of the
template is level (Fig. 22).
3. The template represents the outer limits of the
appliance plus the required minimum side clearance.
4. Mark the position of the flue hole centre and the
inward pointing corners of the two triangular cutouts
in the template. Mark the position of the four fixing
holes. Where possible use the uppermost and lowest
fixing hole positions, otherwise space the fixing holes
as far apart as possible (Fig. 22).
5.4
Rear Flue
Concentric flue kits are available to allow 3 metres
horizontal and 4 metres vertical flueing. Twin flue at
80mm diameter will allow up to 15 metres vertical
flueing.
1. For installations where the flue terminal is
inaccessible from the outside, an internal fitting kit is
available. This can be obtained from your local
merchant quoting Baxi Part N
o
236441.
2. If using the internal fitting kit a 117mm
(4
5
/
in) diameter hole is required.
8
3. Drill the anchorage holes 63mm (2
accept suitable wall plugs (Fig. 23).
4. Using the previously marked flue hole centre, cut a
hole approximately 107mm (4
1
/
masonry for the 100mm (4 in) diameter flue duct.
(When using a core drill, it is important to keep the
drill level and square).
1
/
in) deep to
2
in) diameter in the
4