Baxi Solo 3 PFL 30 Installation & Servicing Instructions Manual page 17

Wall mounted powered flue gas fired central heating units
Table of Contents

Advertisement

Fig. 24
Waste
Fig. 25
Wall Thickness - 40mm
Fig. 26
Waste
Fig. 27
Cardboard
Support
Fig. 28
Fig. 29
© Baxi Heating UK Ltd 2009
Wall Thickness
Wall Thickness
Flue Duct
Waste
Flue Terminal Assembly
Wall Thickness - 40mm
Air Duct
Cardboard
Support
Cut Line
5.0 Installation
5.5
Rear Flue Preparation
Wall thickness 285mm - 500mm (11
section 5.6.
Wall thickness 100mm - 284mm (4 in - 11
If the wall thickness is less than 285mm (11
be necessary to cut the components of the flue to the
appropriate size.
1. Measure the wall thickness (Fig. 24). Mark this
dimension on the Flue Duct from the flared end and
cut the waste off the plain end (Fig. 25).
2. Take the Flue Terminal Assembly and measure from
the terminal end the wall thickness and subtract 40mm
(Fig. 26). Cut the waste off the plain end.
Wall Thickness - 40mm (all boilers)
3. The cardboard support should be installed onto the
flue tubes to ensure the assembly is supported during
cutting (Fig. 28 & 29).
4. Measure the same amount from the flange end of the
Air Duct and cut the waste off the plain end (Fig. 27).
Wall Thickness - 40mm (all boilers)
5. Go to section 5.6.
5
/
- 19
3
/
) go to
16
8
3
/
in).
16
3
/
in), it will
16
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents