Baxi Solo 3 PFL 30 Installation & Servicing Instructions Manual page 27

Wall mounted powered flue gas fired central heating units
Table of Contents

Advertisement

5.0 Installation
5.15
Internal Fitting Kit (Cont)
6. Refit the end piece to the liner and open out to the
Fig. 72
thickness of the wall. Seal the two pieces together
using the tape provided with the kit (Fig 72).
7. Slide the assembled wall liner into the hole in the
wall until the tags stop against the inner wall with the
seam of the liner uppermost. Mark the positions of the
holes in the tags on the wall and then rotate liner so
that tags reveal marks (Fig. 73).
8. Drill and plug the wall in these positions (Fig. 74).
9. Rotate liner back until the tags align with the holes
drilled and secure it to the wall using suitable screws
(Fig. 75).
Fig. 73
10. Make good between the edge of the liner and the
outside wall with cement mortar or a similar
substance, by reaching through the liner and pressing
the mortar between liner and the outside brick work
(Fig. 76). Make good between the liner and the inside
wall. Apply soap solution to the 'O' ring inside the
liner.
11. The rest of the installation may now proceed as
described.
Fig. 74
Fig. 75
Fig. 76
27
© Baxi Heating UK Ltd 2009

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents