Condensate Trap - Carrier R95ESN Installation, Start-Up, Operating And Service And Maintenance Instructions

Single-stage, high efficiency, 4-way multipoise 35-in. (889 mm), condensing gas furnace
Table of Contents

Advertisement

R95ESN: Installation, Start-up, Operating and Service and Maintenance Instructions
3. Outdoor openings shall be sized as follows:
a. Calculate the Ratio of all Indoor Space volume divided by
required volume for Indoor Combustion Air Method below.
b. Outdoor opening size reduction Factor is 1 minus the Ratio in a.
above.
c. Minimum size of Outdoor openings shall be the size required in
Outdoor Combustion Air Method above multiplied by reduction
Factor in b. above. The minimum dimension of air openings shall
be not less than 3 in. (80 mm).

CONDENSATE TRAP

Condensate Trap - Upflow Orientation
When the furnace is installed in the upflow position, it is not necessary
to relocate the condensate trap or associated tubing. Refer to
upflow condensate trap information. Refer to Condensate Drain section
for information how to install the condensate drain.
Condensate Trap
Relief Port
Collector Box
Plugs
UPFLOW TRAP CONFIGURATION
Fig. 8 – Upflow Trap Configuration
(Appearance may vary)
Condensate Trap - Downflow Orientation.
When the furnace is installed in the downflow position, the condensate
trap will be initially located at the upper left corner of the collector box,
as received from the factory. See the top image in
furnace is installed in the downflow orientation, the condensate trap
must be relocated for proper condensate drainage. See the bottom image
in
Fig.
9.
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Fig. 8
Vent Pipe Clamp
Vent Elbow Clamp
Vent Elbow
Collector Box
Plug
Condensate Trap
Relief Port
Condensate Trap
Pressure Switch
Port
1 & 2 Stage Units
Fig.
9. When the
Remove relief tube from relief
port on condensate trap.
Remove the screw
that secures the trap
to the collector box and
remove trap.
Loosen clamp on inlet
to vent elbow.
for
Install the two plugs
previously removed
on the open ports
of the collector box.
Connect relief tube
to port on collector
box.
Rotate elbow to
desired position and
tighten clamp to
15 lb. in.
Outlet
Slide tube in stand offs
4
to adjust length.
A11307
Fig. 9 – Downflow Trap Configuration
Remove plug from
collector box.
DO NOT DISCARD.
NOTE: Remove knockout in
casing before re installing the
condensate trap.
Attach condensate
trap with screw to
collector box.
Install plug on
open port of
collector box
Fig. 10 – Horizontal Right Trap Configuration
11
Remove pressure switch tube from
front pressure switch and discard. A
new tube is shipped in the loose parts bag.
Remove tube from relief port.
Remove middle and bottom
plugs. DO NOT DISCARD.
Unconverted Factory Configuration as
Viewed in the Downflow Orientation
Connect the new pressure switch
tube from Loose Parts bag to
port on front pressure switch.
Align condensate trap
over middle and bottom
ports of collector box.
Downflow Trap Configuration
(Appearance may vary)
If alternate vent position
is required, loosen clamp
on inlet of vent elbow.
Remove the screw that secures
the trap to the collector box and
remove trap.
Unconverted Factory Configuration
As Viewed in the Horizontal Right Orientation
Slide relief tube in stand offs
to adjust length.
Vent elbow shown in alternate
orientation. Tighten clamp on
inlet to vent elbow 15 lb. in.
Align trap over middle and
right hand port on collector box.
Horizontal Right Trap Configuration
(Appearance may vary)
Route tube through inducer
stand offs to adjust position
of the tube.
Trim excess tube.
Connect pressure switch
tube to port on collector
box.
Attach condensate trap
with screw to collector box.
Connect relief tube to
5
relief port on condensate
trap.
A11587
A11573

Advertisement

Table of Contents
loading

Table of Contents