Buderus Logano G615 Installation And Service Instructions Manual page 40

Low-temperature oil/gas boiler boilers for oil/gas-fired power burners
Table of Contents

Advertisement

9
Installing the control panel
Connecting power supply
Hard wire the control panel to the building
power supply following recognized
standards such as EN 50165 and local code,
rules, and regulations.
1
4
Fig. 51 Fastening the connecting cables
1
Sensor wells
2
Sensor retaining clip
3
Cable entry
4
Cable strain relief
B Connect the electrical cables as shown in the wiring
diagram. Take care to ensure proper cable and
capillary tube routing.
Secure all cables with cable strain reliefs.
B Insert cable strain relief with cable inside into the clip
frame and secure by closing the lever.
40
Mounting rear panel and terminal cover
B If necessary, break away section from the rear panel.
B Engage the lower hook of the rear panel section with
the frame at an angle and tilt upward until the upper
hooks engage with the side panels.
B Put the top cover in place and tighten the screws.
3
6 7 0 64 6 5-45.1o
Fig. 52 Mounting the rear wall section
1
Side hooks
2
Rear panel section (control panel)
1
Logano G615 - Subject to technical modifications
6 7 0 64 6 5-46.1o

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents