5.1 Connecting the air supply (for direct vent
operations)
We recommend that the air supply pipe
diameter matches the flue pipe diameter.
Boiler rat-
Required air supply
ing
volumetric flow rate
3
[ft
/min]
9
0
-
4
9
5
120 - 4
95
1
6
0
-
5
1
3
0
200 - 6
160
2
4
0
-
7
1
9
0
280 - 8
220
Tab.9
Air supply volumetric flow rate/Air supply pipe
diameter
10 Min
Fig. 9
Vertical flue system
1
Roof penetration
2
Fire protection collar
3
Fastening the flue pipe
4
Flue pipe adaptor (available separately)
Recommended air supply
pipe diameter
[inches]
5
6
6
8
8
8
1
2
3
3
4
7 747 010 720-14.2RS
Fig. 10 Connecting the air supply for balanced flue
operation
1
Screw
2
Cover plate
Use a 90° elbow for the combustion air inlet
at the entrance to the boiler to avoid an
interference with the gas connection.

5.2 Installing the wall exit for air supply pipe

_ 