Chrysler 2004 Concorde Service Manual page 1612

Hide thumbs Also See for 2004 Concorde:
Table of Contents

Advertisement

24 - 44
PLUMBING
SERVICE PORT VALVE CORE (Continued)
INSTALLATION
NOTE: When assembling the new valve core into
the fitting, the core should be oiled with clean ND8
PAG compressor oil.
(1) Install the new valve core into the fitting.
(2) Evacuate the refrigerant system. (Refer to 24 -
HEATING & AIR CONDITIONING/PLUMBING -
STANDARD PROCEDURE - REFRIGERANT SYS-
TEM EVACUATE)
(3) Charge the refrigerant system. (Refer to 24 -
HEATING & AIR CONDITIONING/PLUMBING -
STANDARD PROCEDURE - REFRIGERANT SYS-
TEM CHARGE)
(4) Install the valve caps.
LH

Advertisement

Table of Contents
loading

This manual is also suitable for:

300m

Table of Contents