Preventive Maintenance Schedule; Modifies Pm Table - Ricoh A219 Service Manual

Table of Contents

Advertisement

10. PREVENTIVE MAINTENANCE SCHEDULE

10.1 MODIFIED PM TABLE
Below lists the modified PM table for the A219 and A245 copiers.
NOTE: 1) The amounts mentioned as the PM interval indicate the number of
copies.
2) Refer to "REGULAR PM PROCEDURE" in this section.
Symbol key: L: Lubricate R: Replace C: Clean I: Inspect A: Adjust
Optics
Reflector
1st to 5th Mirrors
6th Mirror
Lens
Exposure Glass
Platen Cover Sheet
Scanner Guide Rod
Scanner Guide Rail
4th/5th Mirror Guide Rod
4th/5th Mirror Guide Rail
Blue Filter
Exposure Lamp/1st
Scanner Ass'y
Around the Drum
Charge Corona Wire
Transfer Corona Wire
Charge Corona Grid
Transfer Guide Plate
End Blocks and Casings
Charge Corona Cleaning
Pad
Erase Lamp
QL
Discharge Plate
SM
CÓPIA NÃO CONTROLADA
PREVENTIVE MAINTENANCE SCHEDULE
EM
45 k
90 k 135 k 180 k
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
R
C
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C
C
C
C
R
R
R
C
C
R
C
R
C
C
C
C
C
C
C
I
R
R
R
C
C
C
C
C
C
C
C
I
C
C
C
11-39
CÓPIA NÃO CONTROLADA
Notes
C
Silicone cloth
C
Silicone cloth
C
Blower brush
C
Blower brush
Soft cloth dampened with
C
alcohol or water
Soft cloth dampened with
R
water
C, L Dry cloth, Grease - CPL501
Dry cloth, Silicone Grease -
C, L
G501
Dry cloth, Silicone Grease -
C, L
G501
Dry cloth, Silicone Grease -
C, L
G501
C
Soft cloth
Replace at 200 k copies
R
Blower brush
R
Blower brush
R
C
Soft cloth
C
Blower brush or dry cloth
R
C
Blower brush or dry cloth
C
Blower brush or dry cloth
C
Blower brush
A245

Advertisement

Table of Contents
loading

This manual is also suitable for:

B019A245

Table of Contents