Rev. 8/29/97
1. PREVENTIVE MAINTENANCE SCHEDULE
1.1 PM TABLE
NOTE: 1) The amounts mentioned as the PM interval indicate the number of
copies.
2) Refer to "REGULAR PM PROCEDURE" in this section.
Symbol key: L: Lubricate R: Replace C: Clean I: Inspect A: Adjust
Optics
Reflector
1st to 5th Mirrors
6th Mirror
Lens
Exposure Glass
Platen Cover Sheet
Scanner Guide Rod
Scanner Guide Rail
4th/5th Mirror Guide Rod
4th/5th Mirror Guide Rail
Blue Filter
Exposure Lamp/1st
Scanner Ass'y
Around the Drum
Charge Corona Wire
Transfer Corona Wire
Charge Corona Grid
Transfer Guide Plate
End Blocks and Casings
Charge Corona Cleaning
Pad
Erase Lamp
QL
⇒
Discharge Plate
Cleaning
Cleaning Blade
Inside the Cleaning Unit
SM
CÓPIA NÃO CONTROLADA
PREVENTIVE MAINTENANCE SCHEDULE
EM
45 k
90 k 135 k 180 k
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
R
C
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C, L
C
C
C
C
R
R
R
C
C
R
C
R
C
C
C
C
C
C
C
I
R
R
R
C
C
C
C
C
C
C
C
C
C
C
I
R
R
C
C
C
5-1
CÓPIA NÃO CONTROLADA
Notes
C
Silicone cloth
C
Silicone cloth
C
Blower brush
C
Blower brush
Soft cloth dampened with
C
alcohol or water
Soft cloth dampened with
R
water
C, L Dry cloth, Grease - CPL501
Dry cloth, Silicone Grease -
C, L
G501
Dry cloth, Silicone Grease -
C, L
G501
Dry cloth, Silicone Grease -
C, L
G501
C
Soft cloth
Replace at 200 k copies
R
Blower brush
R
Blower brush
R
C
Soft cloth
C
Blower brush or dry cloth
R
C
Blower brush or dry cloth
C
Blower brush or dry cloth
C
Blower Brush
R
Apply setting powder
Remove all toner and
C
developer
A219