4

Installing the boiler

4
Installing the boiler
This chapter describes how to install and place the boiler in the boiler
room.
CAUTION: Risk of system damage from freezing.
▶ Install the heating system in a frost-free room.
4.1

Wall clearances

Position the boiler with the recommended wall clearances. Reducing the
minimum clearances makes the boiler more difficult to access during
installation, maintenance and cleaning.
The boiler base or foundation must be perfectly flat and level.
The burner door is factory-fitted with the hinges on the right. The burner
door can be converted to open to the left (Chapter 4.2, page 15).
Dimension
A
Recommended
minimum
B
Recommended
minimum
C
Recommended
minimum
 Chapter 4.2 , page 15
L
K
Table 10 Recommended and minimum wall clearances (dimensions in
inches).
The boilers are designed for a side clearance of 6".
Where applicable, allow extra wall clearances for
additional components such as DHW tank, pipe
connections, flue gas silencer or other flue components,
etc.
CAUTION: Risk of fire from flammable materials or
liquids.
▶ Clearances less than 6" must comply with local and
statutory codes.
▶ Make sure that there is a sufficient clearance
between combustible materials and the chimney
connection as specified by NFPA 31 (distance of
18 ").
▶ The floor must comply with the requirements of
NFPA 31.
14
Wall clearance
51-1/8"
39-3/8"
27-½ "
15-¾ "
15-¾ "
3-7/8"
Fig. 7
Boiler room clearances (boiler positioned on the l.h. or r.h.
side)
Logano G115 WS US/CA – 6 720 813 418 (2019/09)
7 747 019 141-07.1RS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents