Piping The Boiler; Connecting Central Heating Supply; Fitting The Heating System Return; Installing The Dhw Tank - Buderus Logano plus GB312 Applications Manual

Gas condensing boiler
Table of Contents

Advertisement

  _

6 Piping the boiler

6.1 Connecting central heating supply

VK
1
6
3
Fig. 17 Fitting the B-kit and supply pipe
1
Pressure relief valve
2
Supply pipe (external with NPT thread)
3
Pressure/temperature gauge
4
Threaded flange - 2½" NPT female
5
Check valve (observe direction of flow
6
Gasket
VK
Boiler supply
%.LW 3DUWV OLVW
Quantity
Description
1
Supply Manifold
4
2½" Pipe Size Gaskets
1
Check Valve
1
Pressure and Temperature Gauge
1
Relief Valve - 50psi
12
Nuts -
8
Bolts -
4
Bolts -
24
Washers -
12
Lock Washers
2½"
5
4
NPT
2
Note:
Flow Direction
Arrow
7 747 010 720-04.1RS
)
"
" x 2½" L
" x 5" L
"

6.2 Fitting the heating system return

RK
1
4
Fig. 18 Fitting the return pipe
1
Boiler return
2
Return pipe (external with NPT male thread)
3
Threaded flange - 2½" NPT female
4
Gasket
RK
Boiler return

6.3 Installing the DHW Tank

6.4 Installing the condensate drain

Notes on condensate drainage.
• The condensate that forms in the boiler
and possible in the flue pipe must be prop-
erly drained away from the boiler.
• The condensate which forms in the flue
pipe can be drained via the boiler (install
flue pipe with downward slope towards
the boiler).
• Make sure that drainage of the conden-
sate into the public sewer system con-
forms with the applicable national
regulations.
• Also observe any applicable local regula-
tions.
GB312 Applications Manual
2½"
NPT
2
3
7 747 010 720-81.1RS

Advertisement

Table of Contents
loading

Table of Contents