Throttle Body Construction - Suzuki GSX1300BK B-King Service Manual

Hide thumbs Also See for GSX1300BK B-King:
Table of Contents

Advertisement

1D-9 Engine Mechanical:

Throttle Body Construction

4
(a)
LH
Air cleaner side
LH
Throttle body side
(a)
1. Fuel feed hose
2. ISC valve hose
3. PCV hose
4. PAIR hose
5. EVAP purge control solenoid valve (E-33 only)
3
1
5
2
FWD
"a": 45
"A": First, tighten all the fuel pump mounting bolts lightly and then to the specified torque in the
(3)
(5)
(1)
(2)
(4)
RH
LH
RH
" a "
(a)
ascending order of numbers.
: 1.5 N m (0.15 kgf-m, 1.0 lb-ft)
: 10 N m (1.0 kgf-m, 7.0 lb-ft)
4
2
5
"A"
(b)
" a "
" a "
Engine side
B823H11406009
3
RH
" a "
I823H1140579-06

Advertisement

Table of Contents
loading

Table of Contents